XJ250 Workover Rig

The XJ250 workover rig is a specialized piece of equipment for well servicing in oil fields. It has a rated load of 400 kN and a maximum static load of 675 kN. It is suitable for well servicing operations within a depth of 3200 meters using 2-7/8" externally thickened tubing. The workover rig is composed of a Steyr chassis, power system, single-drum winch, 18-meter two-section upright derrick, traveling system, and hydraulic, pneumatic, and electrical systems. The rig can be configured to use either top-engine power take-off (PTO) or bottom-engine PTO.

产品特点

1. Use a 6×4 or 8×4 type chassis.
2. Main drum equipped with ATD224 push plate clutch; auxiliary braking system with air-controlled disc brakes.
3. Equipped with collision prevention valve-type anti-collision device for the overhead crane; optional electronic collision prevention system.
4. Upright mast type, double-section 18 meters; made of 16Mn angle steel.
5. All pneumatic lines use FESTO quick connectors and pipes.
6. Instrument system operates on 24V DC; lighting system powered by external AC power supply.

产品参数

Workover Rig model

XJ70-1 type (XJ250 type)

Nominal Minor Repair Depth

3200 m [with 73 mm (2-7/8") thickened tubing].

Nominal Major Repair Depth

2000 m [with 73 mm (2-7/8") drill pipe].

Maximum hook load

675 kN

Rated hook load

400 kN

Winch power

187 kW/250 hp

Derrick height

18 m

Effective number of ropes

6

Diameter of hoisting wire rope

22 mm

Maximum Hoisting Speed of Big Hook

1.5 m/s

Travel System

3×4

运行参数

可选配置

资料下载

>联系我们

企业总部

  • 名称:湖北中油科昊机械制造有限公司
  • 地址:湖北省荆州市九阳大道16号
  • 电话:+86 716 8268511
更多联系方式